Usab 675 Residential plots

Population: 1764

Household Numbers: 623

Year Started: 2016

Phase 1

  • Step 1 to 6 completed
  • Profiling was completed

 

Phase 2

  • Step 7 to 13 completed
  • Enumeration was completed

 

Phase 3

  • Step 14 to 18 completed
  • Layout approved by council

 

Phase 4

  • step 18 to 19 completed
  • Structures re-blocked according to layout. Service layout needs to be prepared
  • Professional land surveyor to survey the informal settlement boundaries and internal blocks - FLT
  • 3 more temporary  prepaid communal taps to be installed in new extension of the settlement
  • Town Council with community to cleaning up garbage and debris in  the roads
  • Survey technician to survey the additional 70 plots
  • Surveyor to determine contour levels
  • Engineers to study the water flow in the settlement
  • preparation of service layout by engineering student
  • Draft BoQ of Servicing with which funds are sourced
  • Consulting engineers supervise the students